Repeat a roster every week

Build one week of shifts, then switch on Repeat at the top of the builder, beside Paste in, and choose how many weeks to show after the current one, from 1 to 8. Repeat needs a roster that runs from a week starting date.

How a repeating roster works

Your first week becomes the standard week. It is copied to the weeks after it as drafts, so you can check them and then press Publish all shifts.

The roster then keeps rolling on by itself on the same link, with no end date. A new week is copied from the standard week as each one starts, as drafts, and the week before last comes off. It carries on until you switch Repeat off. Your volunteers keep one link for good.

  • Every week added is a draft, including the ones added as each week starts. Your volunteers see a week once you publish it, so check each new week and press Publish all shifts.
  • On a roster that started more than a week ago, switching it on deletes the shifts before last week for good. The dialog says how many first.
  • A roster holds up to 300 shifts. If the next week would pass that, it isn't added.
  • Switch Repeat off to stop. The weeks already on the roster stay.

Change how far ahead it runs

The number of weeks only sets how far ahead the roster runs. To change it, use Plan the current week and beside Repeat.

More weeks are added straight away, as drafts. Fewer weeks takes nothing off: weeks already on the roster stay.

The standard week badges

  • The week new weeks copy has a Standard week badge on its heading, and the top of the builder says which week it is.
  • If you edit that week, the badge changes to Standard week, changed. New weeks still copy it as it was until you press Update the standard week.
  • Each of the weeks ahead has a Repeated week badge, so with 8 more weeks you can count eight of them after the current week.

Names on repeated shifts

Names you put on a shift repeat with it. Names volunteers took themselves through their personal link don't, so an available shift opens up again each week.

Names don't change the badge. If you put a regular volunteer on one of the standard week's shifts, or take one off, press Update the standard week so new weeks get the change too.

Copies of the standard week leave off anyone who is Invited or Inactive.

Change one day

Change any single day as usual. That change stays on that day only.

Change the pattern

  1. Edit any week the way you want every week to be.
  2. Press Make this the standard week on its heading.
  3. The dialog lists the weeks that haven't started. Tick or untick any of them, then confirm.

Every new week copies it from then on, and the ticked weeks change to match straight away. Shifts you changed for one day stay as they are, and so do notes, places needed and places you changed on one.

A week you have already set up differently, such as a holiday week, starts unticked and says Different from the standard week. Leave it unticked and it stays exactly as it is.

A week with no shifts in it, such as one you emptied with Delete this week, starts unticked and says No shifts in this week. Repeating doesn't fill it by itself. Tick it to fill it with the standard week's shifts, as drafts, then publish them. On the standard week itself the button is Update the standard week.

A shift added to a week you have published is published too, and one added to a week of drafts is a draft.