Runsheets over several days

One runsheet can cover a festival, a tournament or any multi-day event, with one share link for all of it. Type the days into Date range and the items are grouped under a heading for each day. It is free on every plan. A roster runs in weeks instead: see Shifts and rosters.

Set the days

Type the days into Date range, at the top of the builder: 15 to 18 May, 15-18 May or 28 Nov to 3 Dec. A single date makes it one day again.

A runsheet can run for up to 90 days.

The dates decide where the runsheet sits on the calendar and when it counts as over, whatever the items say.

Day headings in the builder

The builder groups the items under a heading for each day, like Day 3 · Monday 16 Nov. The number beside the date is how many items the day holds.

The builder shows every day until two of them have items. After that it lists only the days that have items. To see every day again, tick Show all days above the list. The builder remembers the tick on this browser.

Click a day's heading to fold its items away, and click it again to open it. The builder remembers which days you folded, on this browser, and opens a day again when you add or move an item into it.

Label a day

Type the stage, the ground or the site into Day label beside a day's heading, up to 60 characters. The box suggests the labels already on the runsheet.

The label follows the day's heading on the share link, the printed page and the copied text.

Add items to a day

An empty day shows + Add item, which adds an item pinned to that day at the time the runsheet starts. Change the time as usual.

Items pasted onto the end with Paste in go on the last day in use, or the day after when their time is earlier than where that day has reached.

A pinned time stays on its own day, so a long day above it never pushes it into the next one. See Times, durations and pins for how pins work.

Move an item to another day

To move an item to another day at the same time, use Move only this item to another day in the Move times from here window (the clock icon beside the item). On a phone it's Move to another day in the item's … menu. Undo stays on the bar for 8 seconds.

A pinned item dragged to another day keeps its time and takes that day.

Deleting, moving or unpinning the first item of a day leaves the rest of that day where it is: the next item is pinned at the time it already had.

Reordering within a day keeps the day's start time, so moving the first item down swaps it with the second.

If you shorten the dates

If you shorten the dates while items sit on the days you removed, the items stay and a line under the list says how many are after the last day. Change Date range to include them, or move them to an earlier day.

What volunteers see on the share link

The share link shows a heading for each day that has items on it, with its day label.

Once the event is under way, the share link opens on today. The days already over are folded behind a button at the top of the list, like Show 2 earlier days. An item that runs past midnight stays in view through the day it ends on.

Printing the share link prints every day. For the PDF, the CSV and the copied text, see Print, PDF, CSV and paste in.

One long day is not several days

A one-day runsheet can run past midnight: an item after midnight carries a small +1 against its time. A runsheet over 20 hours long shows a warning under the list, unless Date range holds more than one day.